Min&Pro
Submit an enquiry

Min&Pro LLPsince 2010Kazakhstan

MIN&PRO

Integrated solutions for the mineral processing industry: from process audit to installation supervision and service.

SCROLL
01 / About the company

Full-cycle engineering company for processing plants

Ball mill installation at a processing plant
Metso:Outotec

Joint projects in installation supervision and commissioning

Min&Pro LLP has been operating since 2010 and covers the full cycle of processing plant tasks: audit and strategy, manufacture of wear-resistant ceramics, equipment supply, maintenance and installation.

  • Manufacture of ceramic spigots and rubber-ceramic products
  • Process and technical audits of processing plants
  • Supply of equipment, spare parts and reagents
  • Maintenance, installation supervision and commissioning
More about the company
0 clients
0 years of experience
0 year founded
0 areas of work
02 / Services

Five areas that cover the whole plant

All services
03 / Products

Wear-resistant materials of our own manufacture

High-alumina ceramics, chromium carbide and silicon carbide for abrasive slurries, cement, coal and ore.

Full catalogue
Wear-resistant chromium carbide plates
CR7C3

Wear-resistant chromium carbide plates

Steel with a chromium carbide content above 50%. Its impact and abrasion resistance has made it widely used in mining, mineral processing and metallurgy.

CGM ceramic grinding media
CGM

Ceramic grinding media

Balls and cylinders made of high-alumina ceramics. Balls stabilised with zirconium and yttrium oxides can also be produced.

MCP metal-ceramic pipeline
MCP

Metal-ceramic pipelines

High-alumina ceramic inside the pipeline: pumping of highly abrasive slurries and chemical solutions without wear or corrosion.

RCL rubber-ceramic lining
RCL

Rubber-ceramic lining

Protection of surfaces against wear. The rubber cushioning backing reduces noise, low water absorption prevents build-up.

SC silicon carbide (SSiC / SiSiC)
SSiC / SiSiC

Silicon carbide

Properties close to diamond: the lightest and hardest ceramic material, high thermal conductivity and resistance to acids and alkalis.

ICC wear-resistant ceramic cylinders
ICC

Wear-resistant ceramic cylinders

Lining for steel pipes, bends and tees. Compared with alumina ceramic tiles, installation is cheaper and service life is longer thanks to fewer joints.

RCP rubber-ceramic pipeline
RCP

Rubber-ceramic pipelines

Replacement of rubber-reinforced pipelines for highly abrasive slurries. Connection of mobile equipment, damping of mechanical vibration.

Imported spare parts in stock

Problems with spare parts for imported equipment?

State what you need in the enquiry and we will send a list of items already in stock.

  • Rubber belting
  • Bearings
  • Wear parts
  • Wear-resistant rubber pipelines
  • Mill linings
  • V-belts
Warehouse in KazakhstanEquipment and components in stock
Minimum lead timesShipment without waiting for import logistics
What is in stock
05 / Track record

Completed projects at operating plants

All cases
768tonnes · MPSI 6.7×5.65 and MShTs 5.0×8.0 mills195 days
558tonnes · Skim Air-1200 flotation machines (2 cells), TC-160 (7), TC-70 (7), TC-50 (5), TC-30 (9)57 days
170tonnes · HRT13м thickener, CAVEX hydrocyclones, 34 Weir screens79 days
99.6tonnes · crushing section: CJ-615, SG1841 screen, YPT HD-P feeder23 days
Installed equipment, Bakyrchik gold recovery plant

Filter press installation MFP 2016 07 50/50 M60 complete with a filter cloth washing system.

Motor control cabinet installation (MCC) for the filter.

Filter cloth wash pump KSB Multitec MTCA 50/10 B-3.1.

Acid wash pump Warman 4/3C-AH, A51/A52, CV, N=15 kW, h=27.5 m.

Pump Warman 100VE-GPS, C26, N=11 kW, h=7.5 m, Q=87 m³/h.

Amursky Hydrometallurgical Combine equipment

Carrying out technical and process audits Gold recovery plants No. 1–4 for KBE.

Development of strategic directions for increasing throughput Gold recovery plant No. 4 with flowsheet calculations up to 8 Mt/year.

Process maps, maintenance, repair and lubrication charts for equipment; preparation for the rollout of ERP systems (maintenance module).

Gold recovery plant

Hydraulic systems service ball mills, roller presses and cone crushers.

Plant grinding section

Comprehensive technical and process audit of processing plants No. 1 and No. 2 AMK LLP, Cetco.

Engineers auditing a plant

Installation supervision, commissioning and start-up with Outotec:

  • Albazino
  • Mayskoye
  • Kubaka
  • Omsukchan
  • Zyryanovsk processing plant
  • Ridder processing plant
  • Altyntau Kokshetau
  • Gaisky GOK
Industrial site

Trusted by

Polymetal Polyus Kazzinc NLMK Cetco Metso:Outotec
06 / Vacancies

We are looking for specialists ready to grow with us

All vacancies
  • Head of B2B sales Moscow, Russia Full-time, Mon-Fri Find out more
  • IT resources administrator Remote work Full-time, Mon-Fri Find out more
  • Lead engineer Saint Petersburg, Russia Full-time, Mon-Fri Find out more
Contact us

Still have questions?

Send us an enquiry and our manager will contact you shortly.

By clicking Send, you consent to the processing of personal data